Summerwinds Gate
The Summerwinds Gate has been repaired and is now operational.
The Summerwinds Gate has been repaired and is now operational.
The Jenkins Street back gate has been repaired. Unfortunately, we are still waiting for parts for the Summerwinds Gate which we hope to obtain Monday. Thank you for your patience.
The Jenkins Street gate exiting Ocean Ridge is currently not working. Please use the main gate off Docksite Road or Summerwinds gate to exit the development.
Per the Town of Edisto Beach it is no longer necessary to bag yard debris in paper bags. Plastic trash bags are now permissible.
Thanks to everyone for a great 2017 MPOA Annual Meeting! Check out a few pics on our Flickr site.